Client

Goodman Property Trust

Date

2012

Budget

$21m

Services

  • Project Management

Supercheap Auto needed a new distribution centre to enable efficient import and distribution of its products throughout New Zealand; RDT Pacific was called on to deliver it quickly.

The chosen site was on a strategic and affordable location at Savill Link, Savill Drive, Otahuhu. The client, Goodman, engaged RDT Pacific, due to a strong existing relationship and proven ability to deliver fast track projects.

RDT Pacific managed and delivered multiple contracted portions of work, including adding a significant (a $1million+) variation to the contract.

The variation was a Dangerous Goods store (DGS). The DGS was able to be designed while construction was underway and built without significant impact on the Main Build, adding just 30 days to the construction period. Considerable design, consent and construction challenges also required a collaborative effort between the Client, Project Managers, Designers, Contractors and the tenant.

The construction duration of the project was 147 working days – a tight timeframe for its size: a 600m2 office and 19,000m2 warehouse. Therefore, the project’s programme was managed as a split works package, which allowed the Enabling Works and Main Contract (including six separable portions) to proceed concurrently.

RDT Pacific assisted the tenant in migrating from their existing premises, including specialised racking and stock, in addition to managing the compliance of the dangerous goods store.

Supercheap Auto now has a consolidated logistical foundation with plenty of capacity to efficiently import and distribute stock nationwide. The build was in line with the company’s new brand and is now its New Zealand flagship.